Jan 83 - Aug 83. Systems Engineer. In charge of computer controlled
end-item acceptance testing for control moment gyros (CMG's).
Jun 81 - Jan 83.Systems
Engineer.Assigned to systems
design group on the NASA Advanced Gimbal System (AGS) for use on the Space
Shuttle Orbiter.Responsible
for integration of the AGS with the Orbiter Spacelab and writing ICD's.
Sep 80 - Jan 81.Lead
Engineer on Launch Locks Contract.Responsible
for design of a system of four electromechanical payload clamps for use
within Orbiter Spacelab.Supervised
three engineers.
Jan 80 - Sep 80. Subcontract manager for Air Force Pointing System
proposal.Wrote specifications
and statements of work to procure Star Tracker, IRU, NSSC II Computer, and
Fine Sun Sensor.
Jun 79 - Jan 80.Performed
payload integration study to ensure Annular Suspension Pointing System (a
three axis gimbal system with magnetic isolation) compatibility with large
facility class payloads.